Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following
1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding.
2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others.
3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building.
See attached drawings