WP12.1.1 - Conventional Station Platform Flooring
Scope of Work:
The Conventional Station Platform Flooring Work Package consists of the platform flooring to platforms 1-8, including the flooring within the accommodation buildings situated on the platforms, and comprises of the following scope:
⢠Supply and installation of all Platform paving, including substrate, platform copers, access hatches, drainage
⢠Develop RIBA 4 to construction to include:
o Paving layouts, movements joints, substrate build up, interface details o Confirm material selection.
o Samples, mock-ups and benchmarks as required.
The works are currently programmed to be carried out in two visits. The first visit is on platforms 3-7 and is scheduled to be completed in Feb 2026. The second phase (platforms 1, 2 & 8) due to start in July 2027 and conclude in March 2028
Additional information: No Documentation is included at this point.