BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
To appoint contractors to develop ancillary components (including control valves, excess flow valves & alarms) necessary for the safe installation of hydrogen appliances & comparable on cost to the natural gas approved components used today including hydrogen alarms as part of the Hy4Heat programme's WP4b.
Hy4Heat is a feasibility study to establish if it is technically possible, safe & convenient to replace natural gas (methane) with hydrogen in residential & commercial buildings & gas appliances.
There are 3 lots:
Lot 1:Dev't of piping, pipe fittings, gas valves, gas pressure regulators & emergency control valves that are compatible & safe for use with hydrogen.
Lot 2:Dev't of gas excess flow valves (EFV) suitable for use in low pressure hydrogen supply pipes downstream of the emergency control valve (ECV).
Lot 3:Dev't of domestic alarms compatible & safe for use with hydrogen.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Continental Product Engineering Ltd | 02700257 | ~£720,000 estimated from lot values | - |
| Pietro Fiorentini S.p.A | - | ~£1,440,000 estimated from lot values | - |
Government spending data: These suppliers have received £26,300 in 2 payments (over £25k) from BEIS (2021-03-18 to 2021-04-28).