The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in.
Project location
HM Naval Base Portsmouth
The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.
The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.
KBS Maritime - Introduction
KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.
Project Background
The North Corner Jetty is used berthing of Navy fleet ships. Due to the purpose of the jetty, there are significant amount of movements on and off of the jetty and the is used extensively. The jetty requires maintenance of the steel piled foundations.
6 Berth 3 Basin (6B3) is a gravity retaining structure founded on a timber piled grillage that is constructed from red engineering bricks, concrete, Portland stone and granite. The front face of the ship production hall consists of a reinforced concrete deck supported on tubular steel piles.
The scope of work is covered by four distinct work packages as detailed below;
The last full condition survey for the piles was conducted in 2019 and will be made available alongside drawings.
Please note the contract dates are indicative and could be subject to change due to MMO license approvals and other factors. The indicative contract value is circa £1,000,000 to £1,100,000.
Additional information:
If you are interested in this opportunity, please contact Chris May - at …@kbsmaritime.com to express interest. quoting ref WAT0134-01 6B3 and NCJ Pile Corrosion Protection.
Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received. A Non-Disclosure Agreement will also be required, prior to participating in a Pre-Qualification and/or Invitation to Tender.