BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The requirement is for a high purity hydrogen generator capable of producing a stable and uninterrupted flow of high purity hydrogen gas to multiple MOVPE reactors in a semiconductor manufacturing facility.
The existing hydrogen generation system is sited within the facility building in a ventilated steel enclosure with a footprint of 3.6m x 4.8m, max height 2.8 m. The new system can either be installed within this existing envelope or in an external location in a suitable weatherproof enclosure to be supplied as part of the tender.
Additional information: All tender document, clarification requests & tender returns must be conducted through the In-tend site, via the link shown above.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| H2B2 Electrolysis Technologies SL | - | £680,000 | - |