1. Phase One. To strip, remove and dispose of asbestos paper coated wood fibre board ceilings to the heads office, classroom and corridor 1. Work to be carried out under controlled conditions. To vacuum, decontaminate and prepare for air testing.To supply and install 600 x 600 Armstrong Fine Fissured ceiling tiles upto and including a white, pre-decorated, grid system. To include for all associated cuts, trims and waste.
2. Phase Two. To strip, remove and dispose of asbestos paper coated wood fibre board ceilings to the staffroom, store, toilet areas and corridor 2. Work to be carried out under controlled conditions. To vacuum, decontaminate and prepare for air testing.
To supply and install 600 x 600 Armstrong Fine Fissured ceiling tiles up to and including a white, pre-decorated, grid system. To include for all associated cuts, trims and waste.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Scancross Environmental | 01890293 | £24,000 | - |