BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energyhouse ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU
EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features:
⢠2 large chambers capable of having 2 family homes built in each one (4 homes in total)
⢠Temperature controlled to within 0.5 °C from -20°C to +40 °C
⢠Wind, rain, solar radiation and snow can be generated
⢠These conditions provide testing facilities for housing covering 95% of the global population.
The Energy House 2 Project has a requirement to measure RH&T in a chamber environment. These sensors will form part of a sensor network over 300 sensors. These will report back into a database using the SDI12 standard. Please go to InTend for full tender documentation: https://in-tendhost.co.uk/salford/aspx/Home
Additional information: Please send all correspondence via our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home
No supplier information available.