Text to be corrected in the original notice:
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Instead of: 13 April 2022
Time: 14:00
Read New: 27 April 2022
Time: 14:00
Place of text to be modified: Conditions for opening of tenders
Instead of: 13 April 2022
Time: 14:00
Read New: 27 April 2022
Time: 14:00
Other additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
The Contractor will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following - but not limited to - within the CDM Works area (i.e., The R80 roof area) and in accordance with the Completion Dates (TBC).
â¢8No New Adiabatic coolers (AC's).
â¢Connecting pipework and fittings to and the new AC's within the CDM Works Area.
â¢All types of valves (isolation, regulating, non-return either manual or actuated).
â¢Commissioning sets and pressure reducing valves.
â¢Testing and drainage points.
â¢Basket and other Filters.
â¢All steel support work for the Adiabatic Coolers
â¢All pipework supports.
â¢All local electrical power and signal cabling with cable trays etc and supports