The A303 Stonehenge project has been asked to investigate the impacts of adding emergency refuges or an additional hard shoulder within in the Stonehenge tunnel in order to increase tunnel safety over the 3km bored tunnels. This requires an assessment of the incremental cost and schedule versus the current baseline scheme (D2AP tunnel without refuges or hard shoulder).
Two options are to be considered:
The incremental cost and schedule impacts are to be measured vs the current baseline scheme design. This will require establishing a baseline estimate and schedule with a consistent set of assumptions against which the above options can be compared. The assessment is to include development of design and methodology assumptions in consultation with the A303 Stonehenge project team so that the assessment has a robust design, methodology and schedule basis.
The assessment is to include the following activities
No design cross sections are available for the above options at this time and these are to be developed as part of the assessment. The level of detail within the assessment should be commensurate a concept design / PCF Options Stage 1 level.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Benchmark Estimating | 06142404 | £18,813 | - |