Specialist contractor to undertake the design, construction and commissioning of a new high-density sludge treatment plant and decommissioning of the existing treatment plant.
⢠The project objectives;
⢠Replace the existing Treatment Plant with a High Density Sludge (HDS) plant;
⢠Improve the scheme from an operational, environmental and health and safety perspective;
⢠Improve the longevity and resilience of the scheme;
⢠Provide efficiencies with improved chemical dosing and other controls;
⢠Reduce operational costs;
⢠Assess, record and reduce the carbon emissions associated with the life of the scheme;
⢠Identify cost efficiencies;
⢠Reduce risk of pollution of the River Neath and the Neath Canal;
⢠Comply with the existing discharge consents;
⢠Minimise the downtime of the existing scheme during construction;
⢠Develop plans for the assessment, measurement, and continual improvement of waste management, sustainability and carbon impact for the construction, operation and decommissioning of the scheme.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Kier Integrated Services Ltd | 00873179 | £4,688,222 | - |