To carry out an Energy Audit on the following RMG buildings and M&E HVAC plant.
1. Main Museum Site Greenwich:
Park Row Wing Administration
Queens House Galleries
East & West Colonnade's Museum
East Wing Galleries
Neptune Court Complex Galleries
Sammy Ofer Wing Galleries
South Wing Galleries
West Wing Galleries
2. Royal Observatory Greenwich: All galleries
Flamsteed House
Meridian Building
Great Equatorial Building
Altazimuth Building
Planetarium
South Building
3. Cutty Sark. Museum
To carry out an Energy Audit on the following RMG buildings and M&E HVAC plant.
1. Main Museum Site Greenwich:
Park Row Wing Administration
Queens House Galleries
East & West Colonnade's Museum
East Wing Galleries
Neptune Court Complex Galleries
Sammy Ofer Wing Galleries
South Wing Galleries
West Wing Galleries
2. Royal Observatory Greenwich: All galleries
Flamsteed House
Meridian Building
Great Equatorial Building
Altazimuth Building
Planetarium
South Building
3. Cutty Sark. Museum
4. Kidbrooke Stores and PPMCC. Achieve
5. Brass Foundry. Achieve
Mechanical:
LTHW Heating installation - central plant, distribution, terminal devices
Chilled Water installation - central plant, distribution, terminal devices
Split type AC equipment
Domestic water services - central plant, distribution and terminal devices
Building Energy Management System (BEMS)
Grey water supply - central plant where visible, distribution and terminal devices
Air conditioning systems - central plant, ductwork, grilles etc
Mechanical supply and extract systems
Kitchen supply and extract systems
ATES System
Below ground drainage- Excluded
Electrical:
HV Installation
LV switchgear and distribution
Small power
General lighting
Specialist display lighting
Emergency lighting
External lighting
External power (feeder pillars)
Additional information: Please inform the NMM by Email only if you wish to express an interest in this project. Relevant 'Request for Quotation' documentation will then be Emailed.
Please note the NMM/ROG is part of a UNESCO World Heritage Site and this building is Grade 2 Listed. Specific experience in this field will be essential.
The Contractor will need to carry out an Energy audit on the buildings and plant highlighted in the Tender Exercise Description.
Aim of the audit is to identify energy waste and where new innovations could be implemented in ways of saving energy, save maintenance ongoing costs and potential paybacks.
No supplier information available.