BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Instillation and Commissioning : remove the existing
Promat Hot Zone & reinstate the original OEM Hot Zone along with Shutter Valve, VIP etc and tested. VFE to supply labour only in order to fully commission the
Control System including Single Crystal function & reinstate the original water cooled system etc and tested. VFE to supply & fit new type "K" mineral insulated transitions with vacuum fittings, suitably terminated. VFE to replace existing water hoses on the furnace (except for the one's which have been recently replaced) and re-hose the existing VIP water cooled power cables.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| VACUUM FURNACE ENGINEERING LIMITED | 01920664 | £51,345 | - |
Government spending data: This supplier has received £98,593 in 3 payments (over £25k) from Ministry of Defence (2020-07-30 to 2025-11-24). View full payment history →