BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
This contract is for the redevelopment of Kingston Cromwell Road Bus Station, which includes demolishing the original structure, replacing the existing building and canopy, installation of mechanical and electrical systems, resurfacing, drainage and lighting.
The design is at RIBA Stage 4 for Architectural and Structural elements and RIBA Stage 3 for Civils and Highways. Mechanical, Electrical & Public Health elements will be contractor design.
Transport for London (TfL) requires a contractor to complete the design and construct the new bus station as per the planning consent. The anticipated duration of the contract is 18 months. Procurement documentation can be accessed from the following electronic address: https://procontract.due-north.com/Register. TfL reserves the right to cancel or terminate this procurement at TfL's discretion and without liability to any applicant.
No supplier information available.