BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Mace Dragados are seeking expressions of interest from Subcontractor to deliver the Tower cranes requirements for the project.
The scope of the package consists of but is not limited
Works shall be contracted under NEC3 Engineering Construction Subcontract/ Supply terms and conditions (with project specific amendments)
Suppliers must have extensive demonstrable experience of delivering similar complex packages on previous projects of a similar scale on large major infrastructure projects. This experience must be applicable and relevant to the respective lots listed.
If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list.
Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station.
HS2 Phase One includes construction of a new railway line run from London Euston to new stations at Old Oak Common in West London, an Interchange Station near Birmingham Airport and the National Exhibition Centre (NEC) and a terminus station in Birmingham City Centre (Curzon Street).
No supplier information available.