Works to include the following:
> Dismantling of the affected areas of the structure, including cutting / hydro-demolition, removal of parapet(s), reinforcement to expose the defective area(s) for testing & repair.
> Testing will be conducted by others
>FRC Repair to include reinforcement, general concrete, temporary works & parapet install.
> Approximate deck length is 72m