The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in.
Project location
HM Naval Base Portsmouth
The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.
The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.
KBS Maritime - Introduction
KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.
Project Opportunity
To design and install permanent lifting capability on 3 basin Promontory in Portsmouth Naval Base, Hampshire, PO1 3LS. Budget circa £2M. Completion by May 2025. The Promontory is circa 150m long and 30m wide and is capable of double berthing vessels on each side. The project includes:
· Design and manufacture of crane
· Delivery to Portsmouth Naval Base
· Erection
· Commissioning including test load
· Training
· Warranty
The crane shall have:
· Minimum 55m under hook
· Minimum 80m lift radius, ideally 90m
· Lift 10t at a minimum radius of 50m
· Foundation anchor for long term, permanent use
· Increased corrosion protection for exposed marine environment
· Be designed for Wind Zone D25
Desirable crane options:
· Elevator
· Aircraft warning system
· Cabin air conditioning
· Construction site lighting
· Remote Control
Assume:
· Assume 80% of the lifts are under 5t
· Assume electrical supply is provided by others (using information provided by the crane designer)
· Assume foundation preparation is completed by others (using information provided by the crane designer)
Additional information:
If you are interested in this opportunity, please contact Paul Homshaw - at …@kbsmaritime.com to express interest quoting Supply and Install Permanent Tower Crane in Portsmouth Naval Base. Please also go to Asite Marketplace to register as a supplier. Once registered / if you are already a registered user, please email …@kbsmaritime.com to be added to our connected supply list, quoting full Company Name and Key Contact.
Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received. A Non-Disclosure Agreement will also be required, prior to participating in a Pre Qualification and/or Invitation to Tender.