The New Trinity School has been rebuilt in Lockleaze and has been left with the existing front wall and railings, When the School opened it was discovered the railings could be dangerous with sharp edges. The railings have been removed and temporary (Hired) Heras fencing have been installed. We plan to repair the wall and replace the railings.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Smith & Brenson Ltd | 05882200 | £76,470 | - |