PHOENIX ME LIMITED have been successful in securing Westgate MEPH Design & Build part of the Stage Two of the HS2 MWCC for the S1 and S2 sectors with SCS JV (Skanska Construction UK Limited, Costain Limited, STRABAG AG - UK Branch). Stage Two is the detailed design and construction phase of the project.
PHOENIX ME LIMITED invites you to submit your tender for providing the Design, Supply, delivery & Commissioning of the Switch Panels, Panel-boards, Metering, PFC package including, Training, O&M's & IST, FAT, SAT & attendance as necessary, as detailed in the Sub-subcontract, in accordance with the Invitation to Tender Enquiry and the documentation appended therein.
These works are expected to be delivered in Two Stages, whilst being administered using the NEC3: Engineering and Construction Contract (ECC).
Works Stages:
Stage One - Design and Preconstruction Activities
Stage Two - Manufacturing, Installation and Testing & Commissioning (Including all handover Documentations).