BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The works comprise of the internal refurbishment of the ground floor of 32 St John's Church Road (Admin House).The refurbishment works include but are not limited to the remodel of the ground floor office/ reception area. Works will include the strip out of existing partition walls, erection of new walls to create a new layout, new doors installed, and M&E layout adapted to suit. A new bespoke reception hatch will be built with workstation/desks and shelving to be installed.
Externally, a new main entrance door set will be relocated on the inside face of the wall. A new wider door to match the existing is to be installed. First floor timber sash windows are to be replaced with new like for like windows with double glazed safety glazing. A new pathway is to be installed into the main entrance of Admin House to improve wheelchair access. New signage is to be installed on to the front elevation of both Admin House and 2-4 Clapton Road. Adjustments will also be made to an area of paving outside Admin house.
No supplier information available.