BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Sizewell C Limited (SZC) is undertaking to design and build an EPR Nuclear Power Station at Sizewell C, Suffolk, United Kingdom. As part of this project there is a requirement to procure the design, supply and on-site supervision of the installation and commissioning of auxiliary equipment including boilers, pumps, vessels and associated control system.
The supplier will be appointed to develop a solution for the 'XCA System' to be housed in the site's Boiler (HVB) Building, that will deliver to the high level specification described in the 'background information' attached to this Opportunity.
SZC intends to place the contract for this by the end of Q4 2025, to design and supply these works ready for commencement of works on site currently estimated to be between 2030-2034.
SZC welcomes interest for all or part of the above works, along with proposals for procurement with nominated or JV partners and the like.
No supplier information available.