BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Two new vehicle lifts have been installed in Greenbank Garage Newry, Mourne and Down District Council, however these cannot currently be connected due to insufficient supply capacity. Each lift requires a 32A 400V 3-phase supply, whereas the existing installation provides only a single 16A 400V outlet that previously servicing the old lift.
The existing distribution boards within the Garage contain spare ways, but the circuit breakers required to support new or modified circuits are now obsolete. As such, replacement of the existing distribution boards and associated switchgear is required to facilitate the new lift supplies and to ensure compliance with current electrical standards. The two vehicle lifts are the only items that are provided. The rest of the materials are to be provided by the supplier.
Also al outstanding remedial items identified within the Electrical Installation Condition Report (EICR)
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA16825.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA16825 as the reason for registration.
Any queries please contact MultiQuote on 0151 482 9230.
No supplier information available.