This Work Package is the second Infrastructure Contract package to be let by Homes England for the Northern Arc Project and covers the delivery of approximately 1,100m of single carriageway road with a corridor width from plot edge to plot edge ranging from 13m to 19m and a single span road bridge of 60m approximate length, over an existing water course (a tributary to the River Adur). The envisaged construction period for the works is 14 - 16 months.
This second 'delivery' section of the principal link road highway for Northern Arc is to the western portion of the site, specifically connecting Jane Murray Way (to the south) via a new roundabout on the A2300 to an agreed co-ordinated point within the western site area (immediately after a new bridge crossing over a tributary to the River Adur. This second infrastructure Work Package includes all infrastructure, associated landscape, drainage, utility/utility diversionary works and street lighting works along the highway corridor together with the individual bellmouth connections to future development plots to one/both sides of the new carriageway.
No supplier information available.