Provision of full contract lift crane services for the purpose of deploying approximately 3,850 metres of vacuum insulated tubing (VIT) in the deep geothermal well EG-1 at the Eden Project, Cornwall.
.
The successful contractor will supply fully certified mobile cranes, together with a qualified and certified Crane Operator, Appointed Person and Lift Supervisor and if required a Slinger/Signaller, to undertake planning the lift (including a lift plan), assessing the site conditions, selecting a suitable crane, designating an Appointed Person, supervising the lift, arranging the slinging and signalling and provision of risk assessments and method statements.
.
The successful contractor will be able to supply:
1: A certified mobile crane, or tower crane, in the range 650 - 800 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to:
--Lifting and running down hole a 3,350 metres of 5½" VIT plus 500 metres of 7" tubing and related components and equipment.
--Anticipated period 5 - 7 days
2: A certified mobile crane in the range 50 - 70 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to:
--Suspending tubular running equipment (hydraulic tongs, etc)
--Anticipated period of 5 - 7 days
3: A certified mobile crane, in the range 90 - 150 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to:
--Lifting and running a submersible pump, 300 metres of 5" steel tubing, cable and components.
--Anticipated period 2 days
.
There may be a requirement at a later date for the VIT and associated equipment to be removed from the well, but this will be arranged separately if required.