This project covers the undertaking of works to upgrade and replace the Power Management System [PMS] at the Met Office'sâ¯FitzRoyâ¯Road site in Exeter.â¯â¯
Whereby, the successfulâ¯contractorâ¯will be required to;â¯â¯ design,â¯â¯ manufacture,â¯â¯ test (offsite),â¯â¯ deliver,â¯â¯ install,â¯â¯ test andâ¯â¯ commissionâ¯â¯
⯠a fully functional replacement solution, suitable for retrofit within the confines of the existing system, that meets the performance requirements detailed within this document.â¯
Such that we are looking to receive bids for competent organisations, who have a track record in delivering similar systems. Interested bidders should be available to commit the work on contract award late October, and deliver their proposed solution in a time frame of around 26 weeks
The work is being undertaken to mitigate obsolescence issues with some of the existing hardware sub-systems and to ensure all replaced elements are RoHS compliant.