BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The scheme is to design and carry out the safe survey and demolition of Kingsway Leisure Centre building including removal of floor slabs. The works also include the backfilling of basements, swimming pools, the formation of new levels with topsoil and grass seed to the area left behind. Included in the ground works will be capping off of redundant drains and installation of any precast concrete paving, asphalt works and any kerb details.\r
\r
Please Note:\r
Contractors must undertake a site visit before submitting a tender to ascertain the nature of the site, access thereto and all local conditions and restrictions likely to affect the Works. This is a mandatory requirement.\r
\r
Please visit https://www.the-chest.org.uk/ and search for Project DN751524 to express your interest in this opportunity and access the tender documentation. \r
\r
Please Note: Questions must be raised via the messages facility on The Chest. \r
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Excavation and Contracting (UK) Ltd | - | £189,750 | - |