BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The works consist of refurbishment of expansion joint to two bridges on Colwick Loop Road in Nottingham, this will require the tenderer to undertake the following;
Arrange Highways Permit and provide single lane closure with two-way traffic signal control (possibly outside normal working hours).
Inspect joint rails, replace elastomeric insert, take up and reinstate verge/kerb joint cover plates.
Saw-cut carriageway surfacing adjacent to joint rails, excavate bituminous material to a depth of 40mm (nominally 1m in width) and re-surface with 'Crack Resistant' asphalt.
Works to be completed by 31/03/2022
No supplier information available.