Demolition works including partial removal of upper frame and floors, ground floor, substructure and below ground obstructions, plus removal of all asbestos, desk study / survey, soft strip works, demolition of all brickwork to the perimeter of the building, all external cladding, internal partitions. In-situ plotting of piled foundations and benchmarks, protection to Central Motorway retaining wall and Northumbrian Water sewers. Works to or affecting new and / or existing services including drainage, recycling off-site of demolition arisings; Testing and certifying as Type 1 sub-base material (where suitable) and temporary protection to structure that is to be retained at completion of demolition works.