BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent contractor to provide the fire gas suppression system.
Design, supply, installation, testing, commissioning, certification, and integrity testing of the fire suppression system. This work should be based on the design intent shown in the respective drawings and specifications and comply with HS2 standards. The specialist will be responsible for the complete system, including coordination with mechanical and electrical contractors regarding damper locations, operation, and power requirements.
No supplier information available.