WP12.3 Ancillary Metalwork
Scope of work:
The ancillary metalwork package consists of non-architectural metalwork fixed utilitarian access, balustrades/ guardrails, handrails, barriers, guards, and staircases predominately to back of house (BoH) areas for the HS2 station incorporating the Great Western Main Line (GWML) conventional station and Shared Accommodation Building (SAB), and comprises of the following scope:
Detailed design, supply and installation of station ancillary metalwork to the SAB, GWML and HS2 station areas, including all associated testing and certification of the works.
Metalwork to be fully coordinated with substrates and BoH finishes, including Mechanical, Electrical, Plumbing & Heating (MEPH).
Provide RIBA 5 design including but not limited to fabrication drawings showing general arrangements, elevations, interface details, fixings details, components and performance requirements for construction.