HS2 M56 Concept Schemes
The request is to provide the HS2 engagement team with some urgent, high-level costs of construction for 7 concept designs for proposed layouts at M56 junctions 5 to 6. The level of design definition of these proposals is minimal at this stage. The information currently available is limited to a series of line sketches and a brief narrative around the scope of each concept design.
A12 / A120 Weaving Assurance
The project team would like an order of magnitude cost of construction only for this request to establish what level of confidence can be given to the costs being proposed by Costain in advance of seeking additional funds. The scope of works to price is for:
The project team have moved their preferred location for the new junction 24 further west towards junction 23. In doing this there are traffic weaving concerns due to the distance between the two junctions being less than 2 kilometres apart. A proposed mitigation measure for this issue is to build the new offline A12 westbound link between junctions 23 and 24 as a 4-lane carriageway instead of the currently proposed 3-lane carriageway for c1.25km.
A303 Sparkford to Ilchester
o An apportionment of costs on a monthly burn rate could be used.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Benchmark Estimating | 06142404 | £10,311 | - |
Government spending data: This supplier has received £11,782,904 in 206 payments (over £25k) from Department for Transport, DfT GPC (2018-08-30 to 2026-03-10). View full payment history →