Replace present boiler and burner arrangement with an efficient load matched system with plate heat exchanger (e.g. Potterton boilers and Reillo burners). Adjust flue to suit. Install pressurization unit and expansion vessel on primary side of plate heat exchanger (boiler side). Replace all isolation, balance and DRV valves together with gauges. Replace heating pumps. Replace all insulation with foil wrapped 30mm rock wall, or similar approved.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Advanced Control Solutions | 02650250 | £122,896 | - |
Government spending data: This supplier has received £18,006 in 2 payments (over £25k) from Surrey Police (2020-07-10 to 2020-07-10). View full payment history →