The manufacture and supply of a site cabin unit which will be used as a permanent site management office to a new traveller site currently being constructed in Cornwall, made to the size and layout as shown in the attached drawing /2700/004. The appearance of the cabin should be something that resembles the Control Hut shown in the attached drawing /2700/006, although the cabin unit is to be painted olive drab rather than green. All electrical fittings / bulkhead lights & sanitary ware should be included for. Please specify the approx lead-in period of the site cabin from order.
Additional information: Please email Gemma Parker to express an interest in this opportunity.