1. To provide labour and materials to create a correx and polythene tunnel from the distribution board at the top of the stairs to the heating pumps and control panel. Also to incorporate the water tanks to allow for maintenance. To be constructed from machined 2 x 2 timber frames and to incorporate correx flooring. To create, as far as reasonably practical, an environmental seal between the inside of the tunnel and the wider loft space. All as discussed with you on-site
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Scancross | - | £14,000 | - |