BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
To carry out specialist Re-Lining and renovation works,to a section of highway drain at Atherleigh Way Leigh, in accordance with the performance specification and works information pack.
The contractor will design and specify the system and product to satisfy the required performance specification.
The contractor will provide and operate Jet & Vaccumation Unit to assist in the removal of silt/debris, fat deposits, grout, encrustation, concrete, builder's rubble or roots prior to survey/condition report. Include for the disposal to contractors off-site tip, or to a licneced waste facility, any waste collected or produced during the de-silting/root cutting operation.
Provide materials for and install Ultra Violet (UV ) CIPP) Epoxy Resin Sewer Liner making allowances for intrusions, junctions and connections.
The Contractor to provide all necessary transport, tools, access equipment, appropriate welfare, water disposal and clearance on completion in order to carry out the works effectively.
No supplier information available.