The construction of additional warehouse facilities, approximately 50.00m X 30.00m with an internal height of 7.00m on an existing concrete slab, at the Port of Workington. The works will be procured under a two stage Design and Build Contract with Early Contractor Involvement. It is anticipated that the successful Contractor would be required to have a steel fabricator in place to design and deliver the project to an extremely tight schedule.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Thomas Armstrong (Construction) Ltd | 00818913 | £470,970 | - |