BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
To undertake Engineering Safety Studies (ESS) in response to multiple safety concerns of the public or partners, as brought to the attention of the local Cumbria Road Safety Partnership (CRSP) Group or triggered by collision criteria being reached. Studies which look to find similarities between collisions that have occurred at a single site or across a route which would indicate that there may be a determinable problem with an aspect of the infrastructure, such as road markings or traffic signs. The study will identify and present initial options for remedial measures indicating First Year rate of Return and recommended scheme(s) within a Report.
Additionally, to undertake a Stage 3 Road Safety Audit following the construction of a Zebra Crossing in the South Lakeland town of Grange-over-Sands
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| WSP UK Ltd | 01383511 | £36,851 | LOBBYIST Brevia Ltd (3 quarters) |
Government spending data: This supplier has received £777,056,146 in 10,110 payments (over £25k) from Department for Transport, DEFRA, Department for Education, BEIS, DfT GPC and 20 more public bodies (2012-06-06 to 2026-05-29). View full payment history →