Direct Rail Services requires the services of a competent over hauler to carry out C4 overhaul with additional maintenance work and deliver a full design and build refurbishment programme of two (2) MK2A BSO Coaches.
During the period of maintenance there will be a requirement for additional activities on these coaches this includes but not limited to removal and installation of major equipment, replacement of all external doors, and extensive corrosion repairs to the underframe/ bodyside and full repaint.
The over hauler will be required to provide a full turnkey design service together with a full material management service to these works including a project management service to oversee the full programme to achieve an on-time project.