BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The supply and regeneration of granulated activated carbon (GAC) contained within 9 mobile filter units (MFU's) at the Harwell Groundwater Plant, to manage chemical contamination of groundwater. There are 9 MFU's at the plant, each holding 15m3 of industrial grade GAC. The requirement is to provide a regular exchange programme of the filter units and to supply regenerated carbon to each filter unit at the time of exchange. The service requirement includes collection of 2 MFU's at each scheduled exchange, transportation to the regeneration facility and return of 2 MFU's to the ground water plant facility within 1-2 working days from the collection date. The collection date to be within 3 working days of Magnox notification that an exchange is required. The supplier is required to ensure that after regeneration, the GAC filter medium is capable of a maximum design flow rate of 2,000 m3/d through the groundwater plant.
No supplier information available.