The project comprises the removal of single glazed timber/ steel framed windows and replacement steel framed double glazed units are to be installed within the original apertures in the brickwork. Also included within the scheme are three additional timber windows facing Knight Street, which are to be retained and repaired. The Principal Contractor will be expected to organise/ facilitate a detailed survey by the window installer prior to the Construction Phase.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Orchard Building Contractors Ltd | 07333646 | £48,250 | - |