This scheme consists of excavating the grassed area to both sides of the carriageway down to the hammerhead at the bottom of the street. Excavation will be to a depth of 0.450mm and replaced with full tarmac construction. There will also be new full height kerbs installed to a new perimeter line, additional road gully's installed, ironworks, topsoiling/seeding and Planning (Milling) of the existing carriageway so it can be replaced with new.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Wright Civil Engineering Ltd | 01682425 | £57,710 | - |