BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The principal aim of this project is to provide a step-by-step guide to the flood risk assessment requirements for landowners considering ecohydrological restoration of lowland peat sites, in the context of lowland peat sites with protected status in south Cumbria.
Many lowland peat sites have undergone extensive physical and hydrological modification, including:
Peat cutting with associated drainage to reduce water content of the peat.
Drainage to reduce the water table and allow the land to be used for pastoral or arable agriculture and forestry.
This, combined with a mosaic of ownership and land use history means that such sites are reduced in their natural extent, with severely compromised hydrology and an absence of peat-forming vegetation. This results in degradation of the remaining peat and a net emission of CO2.
Ecohydrological restoration of peatland sites involves disabling man-made and modified drainage using a variety of methods, to reduce hydraulic conductivity and re-instate natural flow pathways. Methods include drain-blocking and cell bunding. These restoration techniques often require permits/planning permission from different bodies, where their safety to infrastructure in the vicinity must be demonstrable.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Jacobs UK Ltd | 02594504 | £31,392 | LOBBYIST Weber Shandwick (7 quarters) Arden Strategies Limited (3 quarters) Portland PR Limited (2 quarters) |
Government spending data: This supplier has received £873,522,673 in 8,883 payments (over £25k) from Department for Transport, DEFRA, Ministry of Defence, Department for Education, DLUHC and 8 more public bodies (2010-07-05 to 2026-06-25). View full payment history →