BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Refurbishment of Hilton Cricket Pavilion, in accordance with the specifications below:
Specification 1
Fit glazed windows to the front - Hardwood flush casement
Insulate loft area - 250mm mineral wool
Insulate external walls - Method to be agreed
Remove internal walls and build stud walls to new layout-TBC
Strip wood T&G, baton & dryline with plasterboard and skim throughout
Plasterboard and skim ceilings
Replace plumbing
Add central heating system (Air source heat pump)
Make good septic tank if necessary
Replace WC (x2), remove shower, WC to suit disabled requirements
Replace electrics, rewire throughout, new consumer unit
Replace lighting - Ceiling spots and wall lights
New external lighting on PIR sensors
Replace kitchenette
Replace external doors and frames - Hardwood ledged
New disability access to west wall
Decorate throughout
Replace flooring - engineered wood boards
Replace missing roof tiles
Fit new protective window lattice screens
Fit retractable dividers to changing room and kitchenette
Fit new external lighting
Specification 2
All the above plus:
Baton and shiplap board external surfaces in larch or oak
Replace six brick peers with cast aluminium posts
Place rainwater goods with galvanised steel
To arrange a site visit and/or submit a quotation please contact Nicola Webster, Clerk to Hilton Parish Council
…@hiltonparishcouncil.com
01480 830605
No supplier information available.