This scope of works covers all the works associated with the use of Formwork/Falsework (falsework as "any temporary support structures for formwork used to mould concrete, but temporary support structures for formwork only") linked to the construction of reinforced concrete works for the primary assets previously discussed.
The party responsible of the package is referred to as the Supplier.
The works to be undertaken is described in the table below. It must be noted this description can evolve depending on the final construction methodology and with the completion of the detailed design.
It is requested to propose several quotations, considering different options of pricing for each package. The requests for each package are indicated here below:
Package 1 - Manor Drive Overbridge Section
Supply only "Buy-in"
Supply only "hire" - to be quoted per week
Package 2 - Birmingham Spur Diveunder Section
Supply only "Buy-in"
Supply only "hire" - to be quoted per week
Package 3a - Coleshill Manor North Retaining Wall Section
Supply only "hire" - to be quoted per week
Supply only "Buy-in"
Package 3b - Coleshill Manor South Retaining Wall Section
Supply only "hire" - to be quoted per week
Supply only "Buy-in"