1) Dismantle, removal and disposal of the complete GT/A2 asset including gas turbine, power turbine, alternator and all associated plant/equipment.
2) The design, supply, installation and commissioning of a dual-fuel capable (natural gas and liquid gas oil) open cycle gas turbine package rated to deliver nominal 14MW of power, to fit into the available footprint following the removal of the GT/A2 asset. (approximate space available 22.6m x 7.58m = 171m²).