The project includes for the removal of redundant reinforced concrete light bollards, perimeter lighting and then installation of new steel lighting columns that are to be fixed to the perimeter wall of car park and to new floor mounted cast in situ reinforced concrete bollards.
The works includes for the final electrical design and installation and all testing and certification to ensure the lights operate as intended.
The Main Contractor is required to programme and co-ordinate the work of any subcontractors and should plan for the works to be completed in 6 weeks.