To carry out specialist injection waterproofing and scour protection to Golborne Dale Bridge 0045, in accordance with the performance specification and works information pack.
The contractor will design and specify the system and product to satisfy the required performance specification.
The material to be used is MC-Injekt GL-95 or similar approved, the contractor and their operatives must be licensed and approved by MC Building Chemicals to install this material.
Bridge No 0045 requires the removal of 30m³ of silt from the South side and the installation of Rip Rap scour protection, along the full length of both the North and South abutments, using limestone boulders of between 400-600mm to extend 1m beyond the bridge.
The Contractor to provide all necessary transport, tools and equipment and access, appropriate welfare , water disposal and clearance on completion in order to carry out the works effectively.