To supply & Install the Local Park 4, the Hard works, Pump track, Drainage & Earthworks to Local Park 4 (LP4). These include 3M wide to MKPT spec Tar Spray & Chip footpaths with timber edging, 1.8M wide Woodland footpath bound gravel surface edged with timber edging, Tarmac surfacing to pump track, Timber benches to the Tar Spray & Chip footpath and on grass of the woodland footpath and two timber KIT Bridges over the existing Ditch as illustrated on the GA Drawing 21114 921 P3 Rev A.
Additional information: For any suppliers interested in this opportunity please visit our e-Tendering portal - https://in-tendhost.co.uk/milton-keynes/