The Pirbright Institute is inviting tenders for the CHP LTHW Heat recovery project - Principal Contractor & Installation Work Package.
The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project.
As part of this tender scope a RIBA3 Design for Tender M&E package has been provided to enable vendors to price this work package.
The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.
The scope of works will involve:
⢠Preparation for a construction ready design as outlined in Section 4.4. Appendix E - CHP LTHW Heat Recovery Principal Contractor Specification V1.1.
⢠Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT.
⢠Planning of works and required shutdowns to implement enabling works
⢠Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program
⢠Final commissioning on completion of system installation.
⢠On completion of commissioning, remove and dispose of any redundant plant & equipment
⢠Management of all subcontractors employed by the supplier to complete these works.
⢠Training and Operational Procedures
⢠On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following:
o Brief Description of the works being carried out.
o Project Risk Assessment.
o Key structural principals.
o Hazardous materials used.
o Information on the future removal of installed plant.
o H&S information about equipment provided for cleaning or maintaining installed plant.
o The nature, location and markings of significant services.
o Information and as built drawings of buildings, plant and equipment.
o Step by step activities to carry out the works.
o Lesson Learnt, challenges met and how they were overcome.
A CDM Construction site will be set up as part of the overall project which will provide for the following:
⢠Site Supervision
⢠HERRAS fencing and appropriate signage around CDM area
⢠Site Office
⢠Welfare Office including changing areas
⢠Waste skips
⢠Scissor lift
⢠Fork-lift truck / telehandler
⢠CDM documentation / inductions / daily logs / management of RAMS
For this tender, the supplier is required to provide a cost for annual servicing of the newly installed heat recovery plant. The requirements for this service contract are:
⢠Spares List showing the itemised costs.
No supplier information available.