Part 1 - Whaw Flood repairs, training wall rebuild approx. 4m, 23m and 9m sections, section of parapet collapsed to be rebuilt, generalised repointing throughout, take down and rebuild breakwater.
Part 2 - Eskeleth South repairs, concrete footing to be cast with rock armour placed along the full width of bridge, 7.5m section of retaining wall to be rebuilt.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| PBS Construction (NE) Ltd | - | £100,000 | - |