The existing panel board within Substation 21 has been continually expanded to a level where the ability to Bus couple or utilise a single generator is compromised, due to the loading on the panel. It is LLA's proposal to reduce the loading by moving critical supplies with minimal impact to a new substation location and then replace critical components within the existing substation.